Location

Çanakkale

Type

Wind

Installed Capacity

29,9 MW

Year of Commissioning

2011

Gold Carbon Certificate

Çanakkale Wind Power Plant, which we commissioned in 2011 in Mahmudiye village of Çanakkale, has an installed capacity of 29.9 MW with 13 turbines. The annual electricity generation capacity of our power plant is 91.6 GWh. The project was granted the "Carbon Gold Certificate" by The Gold Standard Foundation.


Çanakkale HSPP, which we commissioned in 2022 and was established on the land where we have wind power plant in Ezine district of Çanakkale, has a 3.03 MW capacity and solar panels with PV mono-crystalline technology were used in the power plant. The annual average energy generation capacity of the power plant, which which built on approximately 38 decares of land, is 4.78 GWh.

Contact

Mahmudiye köyü 17600 Ezine/Çanakkale

0286 628 77 78
0286 628 77 98
The Nearest Airport
Çanakkale Airport

Power Plants

Power Plant Location Installed Capacity Year of Commissioning
Arkun Dam and HEPP Artvin 245 MW 2014
Çambaşı HEPP Trabzon 44,1 MW 2013
Dağdelen HEPP Kahramanmaraş 8 MW 2013
Doğançay HEPP Adana 62 MW 2017
Hacınınoğlu HEPP Kahramanmaraş 142 MW 2011
Kandil HEPP Kahramanmaraş 208 MW 2013
Kavşak Bendi HEPP Adana 191 MW 2013
Köprü HEPP Adana 156 MW 2013
Kuşaklı HEPP Adana 20 MW 2013
Menge HEPP Adana 89 MW 2011
Sarıgüzel HEPP Kahramanmaraş 103 MW 2013
Yamanlı II HEPP Adana 82 MW 2015
Akhisar WPP Akhisar 55 MW 2011
Balıkesir WPP Balıkesir 143 MW 2012
Çanakkale WPP Çanakkale 29,9 MW 2011
Dağpazarı WPP Mersin 39 MW 2012
Erciyes WPP Mersin 39 MW 2012
Bandırma SPP Balıkesir 2 MW 2017
Karabük SPP Karabük 7 MW 2017
Bandırma I NGCCPP Balıkesir 936 MW 2010
Bandırma II NGCCPP Balıkesir 607 MW 2016
Kentsa NGCCPP İzmit 40 MW 1997
Tufanbeyli Lignite Power Plant Adana 450 MW 2016