Location
Çanakkale
Type
Wind
Installed Capacity
29,9 MW
Year of Commissioning
2011
Gold Carbon Certificate
Çanakkale Wind Power Plant, which we commissioned in 2011 in Mahmudiye village of Çanakkale, has an installed capacity of 29.9 MW with 13 turbines. The annual electricity generation capacity of our power plant is 91.6 GWh. The project was granted the "Carbon Gold Certificate" by The Gold Standard Foundation.
Çanakkale HSPP, which we commissioned in 2022 and was established on the land where we have wind power plant in Ezine district of Çanakkale, has a 3.03 MW capacity and solar panels with PV mono-crystalline technology were used in the power plant. The annual average energy generation capacity of the power plant, which which built on approximately 38 decares of land, is 4.78 GWh.
Mahmudiye köyü 17600 Ezine/Çanakkale