Enerjisa'yı görüntüleyebilmek ve kullanabilmek için tarayıcınızın JavaScript çalıştırmasına izin vermelisiniz.
Location
Adana
Type
Hydroelectric
Installed Capacity
191 MW
Year of Commissioning
2013
Gold Carbon Certificate
Kavşak Bendi HEPP, which we commissioned in 2013, is located on the Adana Seyhan River. Kavşak Bendi HEPP, which has a concrete-faced rockfill structure on the front side and has 3 Francis turbines with a capacity of 62 MW and an environmental flow turbine with a capacity of 5.4 MW, has an installed capacity of 191 MW. The power plant has an annual energy generation capacity of 766.1 GWh and is our project with the highest installed capacity on the Seyhan River. The project was granted the "Carbon Gold Certificate" by The Gold Standard Foundation.
Henüzçakırı köyü Andirap mevkii No:22 Kozan/Adana