Location
Balıkesir
Type
Wind
Installed Capacity
143 MW
Year of Commissioning
2012
Gold Carbon Certificate
Balıkesir Wind Power Plant has an installed capacity of 143 MW with its 52 turbines and is connected to the TEİAŞ Poyraz and Balıkesir 154 Kv switchyards. Our power plant has an annual generation capacity of 549 GWh. The project was granted the "Carbon Gold Certificate" by The Gold Standard Foundation. BARES hybrid solar power plant, the installed power of Hybrid solar power plant of Bares is 395 kW DC / 330 kW AC and was commissioned in 2021. 918 pieces of solar panels used have PV mono-crystalline technology. The power plant includes 3 Sungrow branded inverters with capacity of 110kW each.
The annual average generation capacity of the power plant is 616 MWh and it was built on 4-decare of land.
Bursa yolu 20.km Karakaya köyü mevkii Balikesir