Location

Artvin

Type

Hydroelectric

Installed Capacity

245 MW

Year of Commissioning

2014

Arkun HEPP, which we commissioned in the second quarter of 2014, is located on the Çoruh River on the Erzurum - Artvin provincial border. Our power plant, consisting of 3 main power plants with a capacity of 78 MW and 2 environmental flow power plants with a capacity of 5,4 MW, and a total installed capacity of 245 MW, is the project with the longest energy tunnel among Enerjisa Üretim projects with its 14 km energy tunnel. The annual average energy generation capacity of our power plant is 780.1 GWh.

Contact

Alanbaşı köyü Hav Bağlığı mevkii 08800 Yusufeli/Artvin

0466 821 45 83 / 45 55 / 45 08
0466 821 45 40
The Nearest Airport​​
Erzurum Airport

Power Plants

Power Plant Location Installed Capacity Year of Commissioning
Arkun Dam and HEPP Artvin 245 MW 2014
Çambaşı HEPP Trabzon 44,1 MW 2013
Dağdelen HEPP Kahramanmaraş 8 MW 2013
Doğançay HEPP Adana 62 MW 2017
Hacınınoğlu HEPP Kahramanmaraş 142 MW 2011
Kandil HEPP Kahramanmaraş 208 MW 2013
Kavşak Bendi HEPP Adana 191 MW 2013
Köprü HEPP Adana 156 MW 2013
Kuşaklı HEPP Adana 20 MW 2013
Menge HEPP Adana 89 MW 2011
Sarıgüzel HEPP Kahramanmaraş 103 MW 2013
Yamanlı II HEPP Adana 82 MW 2015
Akhisar WPP Akhisar 55 MW 2011
Balıkesir WPP Balıkesir 143 MW 2012
Çanakkale WPP Çanakkale 29,9 MW 2011
Dağpazarı WPP Mersin 39 MW 2012
Erciyes WPP Mersin 39 MW 2012
Bandırma SPP Balıkesir 2 MW 2017
Karabük SPP Karabük 7 MW 2017
Bandırma I NGCCPP Balıkesir 936 MW 2010
Bandırma II NGCCPP Balıkesir 607 MW 2016
Kentsa NGCCPP İzmit 40 MW 1997
Tufanbeyli Lignite Power Plant Adana 450 MW 2016