Location

Adana

Type

Hydroelectric

Installed Capacity

62 MW

Year of Commissioning

2017

Doğançay HEPP, which we commissioned in 2017 and has an installed capacity of 62 MW, is located on Doğançay Çay in Adana Seyhan Basin. Doğançay HEPP, one of the two projects opened with a tunnel boring machine (TBM) by going beyond the traditional methods, was built underground with all its units except for the regulator area. It consists of a regulator structure with a height of 30 meters from the foundation, a 6.9-kilometer-long energy tunnel opened with a tunnel boring machine, a 273-meter-tall surge tank, a penstock shaft and a 514-meter-long penstock tunnel. In the project, which has a Cavern (underground power plant) type power plant, which can be reached through a 70-meter-long tunnel, unlike other projects, the control of the water released from the spillway is carried out with an inflatable flume made of a special membrane, instead of steel covers, facilitating the construction and operation.

Contact

Gökçeköy köyü Değirmen Yanı mevkii Aladağ/Adana

0322 527 23 71-72-73
0322 527 23 74
The Nearest Airport​​
Adana Airport

Power Plants

Power Plant Location Installed Capacity Year of Commissioning
Arkun Dam and HEPP Artvin 245 MW 2014
Çambaşı HEPP Trabzon 44,1 MW 2013
Dağdelen HEPP Kahramanmaraş 8 MW 2013
Doğançay HEPP Adana 62 MW 2017
Hacınınoğlu HEPP Kahramanmaraş 142 MW 2011
Kandil HEPP Kahramanmaraş 208 MW 2013
Kavşak Bendi HEPP Adana 191 MW 2013
Köprü HEPP Adana 156 MW 2013
Kuşaklı HEPP Adana 20 MW 2013
Menge HEPP Adana 89 MW 2011
Sarıgüzel HEPP Kahramanmaraş 103 MW 2013
Yamanlı II HEPP Adana 82 MW 2015
Akhisar WPP Akhisar 55 MW 2011
Balıkesir WPP Balıkesir 143 MW 2012
Çanakkale WPP Çanakkale 29,9 MW 2011
Dağpazarı WPP Mersin 39 MW 2012
Erciyes WPP Mersin 39 MW 2012
Bandırma SPP Balıkesir 2 MW 2017
Karabük SPP Karabük 7 MW 2017
Bandırma I NGCCPP Balıkesir 936 MW 2010
Bandırma II NGCCPP Balıkesir 607 MW 2016
Kentsa NGCCPP İzmit 40 MW 1997
Tufanbeyli Lignite Power Plant Adana 450 MW 2016