1995-2000
1996

Establishment of Enerjisa Enerji Üretim A.Ş.

Groundbreaking of Kentsa Power Plant

1997

The first electricity generation at Enerjisa Üretim A.Ş.

2000-2005
2002

The first electricity generation at Adana Power Plant (Commissioning of 1st and 2nd gas turbines)

The first electricity generation at Çanakkale Power Plant (Commissioning of 1st gas turbine)

2003

The first electricity generation at Mersin Power Plant (Commissioning of 1st gas turbine)

2004

Establishment of Enerjisa Elektrik Enerjisi Toptan Satış A.Ş.

Establishment of Enerjisa Doğal Gaz Toptan Satış A.Ş.

2005-2010
2005

Revision of Auto Producer Group Licences to Generation Licences

2006

Establishment of Energy Group Presidency in Sabancı Holding

2007

Joint venture of Sabancı Holding with Verbund

2010-2015
2010

Commissioning of Bandırma Natural Gas Combined Cycle Power Plant with an installed capacity of 930 MW

Enerjisa Doğal Gaz Toptan Satış A.Ş. was awarded import (Spot LNG) licence

2011

First natural gas purchases and sales by Enerjisa Doğal Gaz Toptan Satış A.Ş.

Commissioning of the Hacınınoğlu Hydroelectric Power Plant with 142 MW installed capacity.

Commissioning of Çanakkale Wind Power Plant with 30 MW installed capacity

Commissioning of Menge Hydroelectric Power Plant with 89 MW installed capacity

2012

Commissioning of Dağpazarı and Bares Wind Power Plants

Signing the 750 million EU financing package for the finance of Tufanbeyli Lignite Power Plant

Signing the 135 million EU financing package for the finance of Bares Wind Power Plant

Signing a partnership agreement between Sabancı Holding and E.ON, with the agreement to transfer Verbund's 50% share in Enerjisa to E.ON

The installed capacity of Enerjisa Enerji Üretim A.Ş. reached 2419 MW

2013

Actualization of E.ON and Sabancı Holding Partnership

Commissioning of 156 MW Köprü Dam and HEPP

Commissioning of 8 MW Dağdelen HEPP

Commissioning of 143 MW Balıkesir Wind Power Plant

Commissioning of 208 MW Kandil HEPP

Commissioning of 20 MW Kuşaklı HEPP

Commissioning of 103 MW Sarıgüzel HEPP

Commissioning of 44 MW Çambaşı HEPP

Commissioning of the 1st unit of 62 MW Kavşakbendi HEPP

2014

Commissioning of all units of the 191 MW Kavşakbendi Hydroelectric Power Plant

Commissioning of the 245 MW Arkun Hydroelectric Power Plant

Commissioning of 3 MW Bandırma Hydroelectric Power Plant

2015-2020
2015

Commissioning of 2nd Stage of 22 MW Yamanlı II HEPP

2016

Commissioning of all units of the 82 MW Yamanlı II Hydroelectric Power Plant

Commissioning of 450 MW Tufanbeyli Lignite Power Plant, Turkey's largest domestic lignite power plant established by the private sector

2017

Commissioning of 607 MW Bandırma II Natural Gas Combined Cycle Power Plant

Commissioning of 62 MW Doğançay Regulator and Hydroelectric Power Plant

Commissioning of 2 MW Bandirma Solar Power Plant

Starting to manage Generation and Trade operations under “Enerjisa Üretim Santralleri A.Ş.”, and Distribution and Sales operations under “Enerjisa Enerji A.Ş.”

Commissioning of 7 MW Karabük Solar Power Plant

2022
2022

Commissioning of 65 MW Erciyes Wind Power Plant

Acquisition of 55 MW Akhisar WPP

2023
2023

Acquisition of 18,9 MW Çeşme WPP

Acquisition of 25.2 MW Akköy WPP

Acquisition of 7,2 MW Dikili WPP

2024
2024

Acquisition of 14 MW Aydos WPP