Location
Trabzon
Type
Hydroelectric
Installed Capacity
44,1 MW
Year of Commissioning
2013
Çambaşı HEPP, which we commissioned in 2013, is located on Solaklı Stream in Çaykara district of Trabzon. The power plant has a total installed capacity of 44.1 MW, with 2 separate regulators and a 2 km transmission tunnel connecting them, and 2 Pelton turbines of 22.05 MWm. The annual average energy generation capacity of our power plant is 200.5 GWh.
Işıklı mah. Belediye sok. No:12 Çaykara/Trabzon