Location

Kahramanmaraş

Type

Hydroelectric

Installed Capacity

103 MW

Year of Commissioning

2013

Gold Carbon Certificate

Sarıgüzel Dam HEPP, which we commissioned in 2013, is located in Kahramanmaraş. The project consists of a concrete-faced sand, gravel, rockfill dam structure and includes two Francis turbines, each with a capacity of 49.44MW, and a 3.66MW environmental flow turbine. The annual generation capacity of our power plant with a total installed capacity of 103 MW is 311.8 GWh. The project was granted the "Carbon Gold Certificate" by The Gold Standard Foundation.

Contact

Hacınınoğlu köyü Ilıca Beldesi/K.maraş

0344 228 12 60
0344 228 12 61
The Nearest Airport
Kahramanmaraş Airport

Power Plants

Power Plant Location Installed Capacity Year of Commissioning
Arkun Dam and HEPP Artvin 245 MW 2014
Çambaşı HEPP Trabzon 44,1 MW 2013
Dağdelen HEPP Kahramanmaraş 8 MW 2013
Doğançay HEPP Adana 62 MW 2017
Hacınınoğlu HEPP Kahramanmaraş 142 MW 2011
Kandil HEPP Kahramanmaraş 208 MW 2013
Kavşak Bendi HEPP Adana 191 MW 2013
Köprü HEPP Adana 156 MW 2013
Kuşaklı HEPP Adana 20 MW 2013
Menge HEPP Adana 89 MW 2011
Sarıgüzel HEPP Kahramanmaraş 103 MW 2013
Yamanlı II HEPP Adana 82 MW 2015
Akhisar WPP Akhisar 55 MW 2011
Balıkesir WPP Balıkesir 143 MW 2012
Çanakkale WPP Çanakkale 29,9 MW 2011
Dağpazarı WPP Mersin 39 MW 2012
Erciyes WPP Mersin 39 MW 2012
Bandırma SPP Balıkesir 2 MW 2017
Karabük SPP Karabük 7 MW 2017
Bandırma I NGCCPP Balıkesir 936 MW 2010
Bandırma II NGCCPP Balıkesir 607 MW 2016
Kentsa NGCCPP İzmit 40 MW 1997
Tufanbeyli Lignite Power Plant Adana 450 MW 2016